-40%

Concrete Vibrator 35MM Stable Voltage 800W Motor Simple to Handle Construction

$ 73.91

Availability: 10 in stock
  • Max Amplitude: 0.8mm
  • Power: 800W
  • Type: Vibrator Head
  • Condition: New
  • Refund will be given as: Money Back
  • MPN: Does Not Apply
  • Return shipping will be paid by: Buyer
  • All returns accepted: Returns Accepted
  • Restocking Fee: No
  • Item must be returned within: 30 Days
  • Voltage: 220V
  • Speed: 4500r/min
  • Tube Diameter: 35mm
  • Brand: Unbranded

    Description

    Home
    Shipping
    Payment
    Returns
    About Us
    Contact Us
    Shop Categories
    Home & Garden
    Business & Industrial
    Jewelry & Watches
    Toy & Hobbies
    Health & Beauty
    Pet Supplies
    Home Arts & Crafts
    Daily Deals
    Helpful Links
    Visit Our Store
    Add to Favorite Seller
    Sign Up Newsletter
    Contact Us
    About Us
    View Feedback
    Concrete Vibrator 35MM Stable Voltage 800W Motor Simple to Handle Construction
    DESCRIPTION:
    促销8
    Description:
    Hand Held Concrete Vibrator, is a kind of professional construction tool machine, widely used in construction places. Easy to operate, the electric concrete vibrator is essential to construction use, ensuring the fastness of buildings. Vibrate pouring concrete to make it dense. It suits for both construction sites and home.
    Parameter:
    Model
    35-1A Concrete Vibrator
    Voltage
    220V(do not support 110V)
    Power
    800W
    Frequency
    2300
    Speed
    4500r/min
    Tube Diameter
    35mm
    Max Amplitude
    0.8mm
    How to use
    Maintenance and inspection
    Before any work on the machine itself, pull the mains plug.
    1.The brushes should be checked periodically and warm-out brushes should be replace in time, after replacing, inspect, whether the new brushes can move freely in the brush holder,keep running the motor for 15 minutes to match the contact of brushes and commentators.
    2.Keep the ventilation slots clear from dirt , clean off the accumulated dust and oil dirt periodically.
    3.During normal operation , if anything happens ,the power supply should be cut off at once and the tool should be checked and repaired
    4.Regular inspect all mounting screws and ensure that they are properly tightened, should any of the screws be loosen, Tighten them immediately, failure to do so could result in personal injury
    5.Do not expose the tool to rain , Do not use power tools in damp or wet location ,keep work area well lit do not use power tools where there is risk to cause fire or explosion
    6.Notice:color will send randomly.
    Package Included:
    1x Concrete Vibrator
    SHIPPING:
    International Buyers Please Note:
    A
    . Import duties, taxes and charges are not included in the item price or shipping charges.
    These charges are the buyer responsibility.
    B
    . Please check with your country customs office to determine what these additional costs
    will be prior to bidding/buying.
    China to United States, by ePacket :
    Business Days
    (not+ holidays)
    ≦5
    6 to 10
    11 to 17
    18 to 25
    26 to 32
    >32
    United States
    Arrived Rate
    4.90%
    39.20%
    39.10%
    11.40%
    4.40%
    Contact Seller
    China to Other Countries, by
    China Post Registered Parcel:
    Country
    Estimated Delivery Time
    Business Days
    (not+ holidays)
    5 to 9
    10 to 16
    17 to 20
    21 to 25
    26 to 30
    >31
    United Kingdom
    Arrived Rate
    4.90%
    37.20%
    39.10%
    13.40%
    4.40%
    Contact Seller
    Australia
    Arrived Rate
    6.40%
    29.20%
    46.30%
    10.20%
    7.10%
    Contact Seller
    Canada
    Arrived Rate
    3.30%
    34.20%
    40.90%
    16.80%
    3.90%
    Contact Seller
    Expedited Int'l Shipping:
    Fedex
    ,
    DHL
    ,
    UPS
    ,
    TNT
    and
    EMS
    courier,7-10 Business Days
    PAYMENT:
    1.
    We accept
    PayPal
    only.
    Credit card
    or
    e-Check
    via PayPal will be accepted
    2.
    Payment must be received within
    7 business
    days of auction closing.
    3.
    We ship to your eBay or Paypal address. Please make sure your
    eBay
    and
    Paypal address
    is
    correct
    before you pay
    Attention: please give us your contact phone number, which be filled in the shipping form
    CONTACT US:
    Monday
    to
    Saturday
    9:00 am
    -
    12:00 pm
    (GMT+0800)
    We will reply your E-mail within our business hours,please be free to contact us if you have any question.